Customization: | Available |
---|---|
CAS No.: | 7429-90-5 |
Main Raw Material: | Epoxy |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Color
|
Any solid color
|
Mix Ratio
|
JD-148A:JD-148B=5:1
|
Compressive strength (Mpa)
|
≥85
|
Impact resistance strength (Kg·cm)
|
65
|
Flexural strength (Mpa)
|
≥75
|
Adhesive force grade
|
1
|
Hardness (Shore D)
|
≥83
|
Abrasion resistance(750g/1000r, zero gravity, g)
|
≤0.03
|
Resistance to engine oil, diesel oil for 60 days
|
Passed
|
Resistance to 20% sulfuric acid for 20 days
|
Passed
|
Resistance to 20% Sodium hydroxide for 30 days
|
Passed
|
Resistance to toluene, ethanol for 60 days
|
Passed
|
Service life
|
8 years
|
Surface preparation
|
Correct substrate preparation is critical for optimum performance. Surface should be sound, clean, dry and free from loose
particles,oil,grease,and other contaminants. |
|
Primer
|
Prepare a barrel, pour JD-D10A and JD-D10B in it based on 1:1. Stir the mixture well and then apply it with roller or trowel. The
reference consumption is 0.15kg/m².The main purpose of this primer is to seal the substrate completely and avoid air-bubbles in the body coat. A second coat may be required depending on the oil absorption condition of substrate. The recoat time is about 8 hours. |
|
Inspection standard for the primer: even film with certain brightness.
|
|
|
Undercoat
|
Mix WTP-MA and WTP-MB based on 5:1 first, then add quartz powder (1/2 of the mixture of A and B) into the mixture, stir it well
and apply with trowel. The consumption quantity of A and B is 0.5kg /sqm. You can do it one coat at one time or two coats at two times. In the second case, the application interval is about 8 hours at 25 degrees. Sand the first layer, clean it and then apply the second layer. After the whole application, wait another 8 hours, grind it, clean the sanding dust and then continue the next procedure. |
|
Inspection standard for the undercoat: Non-sticky to hand, no softening, no nail print if you scratch the surface.
|
|
|
Top coat
|
Mix JD-2000A and JD-2000 B based on 5:1 and then apply the mixture with spatula. The consumption quantity is 1.0kg/sqm.
|
|
Maintenance
|
5-7 days. Don't put the floor into use or wash it with water or other chemicals.
|